How long does installation take?
With Swift Solar Solutions · Illustrative scenes and explanatory diagrams.
The short answer
Many straightforward home installations take one or two working days on site. Survey, design, access arrangements and the network connection process happen beforehand. Roof type, system size, electrical work and weather can change the programme, and commissioning and handover are part of the job.
Full video transcript
How long does a solar installation take? Many straightforward home installations can be completed in one or two working days, but every property is different.
Before the team arrives, we complete the survey and design, organise access and scaffolding, and deal with the required network connection process.
Roof type, array size, cable routes and battery location affect the programme. Additional electrical work, poor weather or a more complex building can extend it.
Once the equipment is fitted, we test and commission the system. A neat row of panels is only one part of a finished installation.
We also explain the monitoring app, operation and handover documents. Swift Solar Solutions agrees a realistic timetable with you beforehand and keeps you informed as the work progresses.