Bring electricity use into the design
Provide recent electricity bills and half-hourly consumption data where available. Explain operating hours, weekend use and seasonal shutdowns. Annual consumption alone does not show how closely solar generation will match the demand inside a building. Include planned equipment changes, additional machinery or EV charging so these can be considered separately from existing use.
Document the roof and access
Send available roof plans, photographs and information on the roof covering, repairs and ownership. Identify rooflights and equipment that require ongoing access. Let us know about sensitive working areas and the times installation activity could take place. Any required specialist roof or structural assessment should be identified in the project scope.
Explain the electrical arrangement
Tell us about meters, separate buildings and the position of the main electrical equipment. Existing solar, generators, batteries and proposed new loads all matter. Network requirements and possible export restrictions should be considered as part of the design, before treating an estimated export income as available.
Ask for a transparent business case
Compare the installed scope, generation forecast and assumed on-site use. Keep self-consumption value and export income separate and check the electricity prices used. Ask how the result changes if demand or tariffs change. A battery may be worth assessing, but it should solve a specific demand, operating or backup requirement rather than being added automatically.
Plan delivery and aftercare
Agree responsibilities for access, installation scheduling, handover and monitoring. Ask what information will be provided to the person managing the building after commissioning. Swift’s portfolio includes hospital, school, farm and business installations; the relevant example is the one that helps explain your building and operating requirements, not simply the largest array.